CONTACT

Comsys Helps Sawmill Double Capacity with Innovative Second Life Battery Solution

Recent trials of an onsite energy storage installation built by Comsys using swapped-out EV batteries has enabled a sawmill in Germany to increase production by 100% by making it possible to run a second saw without limitation. The objective of the project was to study this second-life battery application as an alternative to installing additional capacity from the grid, which is typically too costly, to supply the peaks of a highly variable load.

Dan Liljengren, Head of Research and Innovation at Comsys, explains why the sawmill made a good choice for the trials: β€œIn applications like sawmills, the power is very volatile due to the significant difference between high load and low load, and the demand fluctuates as a natural part of the sawing process. For such applications, often situated in remote areas, a battery installation can supply the saws at high load demand to supplement the limited power available from the grid. At low load the battery is charged.”

 

Source: Comsys AB β”‚ www.comsys.se
Image: Comsys AB β”‚ www.comsys.se
The ees International Magazine is specialized on the future-oriented market of electrical energy storage systems, not only from a technological-, but also a financial and application-oriented point-of-view. In cooperation with ees Global, the ees International Magazine informs the energy industry about current progress and the latest market innovations.
Contact: Xenia Zoller - zoller(at)ees-magazine.com